T&S Structural was the Structural Engineer for this $7M project, for a 560 ft. long, 35-span, new heavy timber bridge structure on existing retrofitted footings and bents, making the project feasible by not impacting endangered species and habitat. Responsibilities included structural engineering from feasibility study, conceptual level, design phase final plans and specifications, and construction support services.